Exhibition Timeline 34: 1st Day Constructing

IMG_8372 Lumber for the installation

IMG_8370  Bow section frames and platforms

IMG_8371  Stern section frames

IMG_8369  IMG_8368  Alcove gallery section frames and objects

IMG_8374  Most of the bow section frames bolted together.  Platforms are placed inside.  The prow point has the raised floor for the first memory space installed.

IMG_8373  Stern section frames bolted together

IMG_8374a  Lexi Narduzzi is assisting me.  She is a SCAD alum from the Sculpture Program.  Here she’s installing the remaining bow frame.  Then we attach the whole section to the gallery wall.

IMG_8374b  With the frames for the Alcove Gallery section installed, you can see how the ship hull alignment is working.

IMG_8374c  The last things we did for the day was to screw to wall supports into place along the gallery walls at each installation section.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s